ECM design consultant Singapore, QECP-endorsedpe@qp.sg
ECM Design Singapore

Earth Control Measures design for construction sites

QECP-endorsed design and documentation for construction site erosion control, sedimentation management and temporary drainage planning, ready for PUB submission.

What the ECM design package can include

Written to help the project team understand what information is needed and why it matters, and to support PUB submission.

1

Site runoff strategy

Review site layout, levels, discharge points and sequencing constraints.

2

Sediment control details

Prepare concepts for silt trap, sedimentation basin, perimeter cut-off drain, wheel wash and temporary measures.

3

Maintenance notes

Provide practical inspection and maintenance notes for construction implementation — see the ECM inspection checklist.

ECM Design FAQ

Q

How long does ECM design take?

Most ECM design packages are turned around within 3–7 days, depending on site complexity and the information available.

Q

What information is needed to start?

A site plan, existing and proposed levels, discharge points, and the construction sequencing or programme.

Q

Does the ECM design need QECP endorsement?

Yes. PUB requires the ECM plan to be endorsed by a Qualified Erosion Control Professional (QECP) and approved by PUB before work begins. See about our QECP.